Day 7: Plumbing out Side the Kitchen
|
The guest bath toilet was a dud, and we bought a new one for the powder room, and moved the powder room toilet to the guest bath. That way we have the elongated toilet downstairs since it will, no doubt, be the most used toilet.
|
Day 8: Paint
|
Our installer textured and painted the ceiling, but we still haven't figured out what we want on the walls... not these.... |
Day 9: Trying to use our unfinished Kitchen!
|
If you couldn't tell, the whole job has slowed down, and we are waiting to get back on track. |
So all we have is our refrigerator hooked up and our microwave hood sitting in the corner for small tasks. We've just been cleaning the floors and the sides of the cabinets a little, waiting for the cabinets to be finished and the granite to be installed.